/
events

Key Ward on the road

WCX™ 2026 World Congress Experience

April 14, 2026

-

April 16, 2026

Detroit, Michigan

join us there

Leading Engineering Organizations Gain an Advantage with Key Ward

Modeling

“Key Ward reduced RFQ time from 1.5 months to days. And it’s got a great interface as well.”

Sr. Development Engineer Tier 1 Supplier

Validation

“We’ve eliminated 4–5 hours of manual data handling per cycle. Our engineers now go straight from test to insight because Key Ward auto-connects to our rigs, instantly structuring data for analysis and optimization.”

Sr. Development Engineer

Modeling

”Key Ward helped FEV turn simulation data into reusable engineering intelligence that enabled faster convergence, lower cost experimentation, and scalable CFD workflows.”

Lead CFD engineer

Concept

“What used to take days now takes minutes. We spend less time processing data and more time making decisions. We have clear visibility into the data that is being used to train our models.”

Dr. Thibault Lafont

Technical Expert, Acoustics

Post-Launch

“By connecting plant and field data with explainable AI, a leading automotive OEM moved from reactive troubleshooting to proactive, data-driven reliability engineering, turning post-launch data into strategic advantage“

Sr. Development Engineer

Modeling

“Key Ward helped our engineering program move beyond brute-force simulation using structured data and reduced order models to optimize aerodynamics faster, at a lower cost, and at scale"

Senior Aerodynamics Engineer

Build the Data Foundation for AI-Driven Engineering